ASGI-2011-003 (ASGI-2011-003)
ASGI-2011-003 is a 10.0 MW wind interconnection project in Crosby, Texas with a current status of operational.
10.0 MWCapacity
OperationalStatus
TXMarket
WindTechnology
Project facts
| Canonical name | ASGI-2011-003 |
|---|---|
| Queue ID | ASGI-2011-003 |
| Status | operational |
| Source status | IA FULLY EXECUTED/COMMERCIAL OPERATION |
| Market | TX |
| Technology | Wind |
| Capacity | 10.0 MW |
| State | Texas |
| County | Crosby |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2011-06-29 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SPP |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata