Asheville BESS (69429_AVLB1)

Asheville BESS is a 17.3 MW battery interconnection project in Buncombe, North Carolina with a current status of active.

17.3 MWCapacity
ActiveStatus
CPLWMarket
BatteryTechnology

Project facts

Canonical nameAsheville BESS
Queue ID69429_AVLB1
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketCPLW
TechnologyBattery
Capacity17.3 MW
StateNorth Carolina
CountyBuncombe
Point of interconnection
Requested (queue) date
Proposed in-service date2026-08-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata