Ashley 138 kV Substation (J797)

Ashley 138 kV Substation is a 70.0 MW solar interconnection project in Washington County, Illinois with a current status of withdrawn. It is proposed to connect at Ashley 138 kV Substation.

70.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameAshley 138 kV Substation
Queue IDJ797
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity70.0 MW
StateIllinois
CountyWashington County
Point of interconnectionAshley 138 kV Substation
Requested (queue) date2017-06-16
Proposed in-service date2019-09-01
Operational date2019-09-01
Withdrawn date2018-05-30
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata