Ashley (J3013)

Ashley is a 100.0 MW solar+battery interconnection project in Washington, Illinois with a current status of withdrawn. It is proposed to connect at Ashley.

100.0 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameAshley
Queue IDJ3013
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar+Battery
Capacity100.0 MW
StateIllinois
CountyWashington
Point of interconnectionAshley
Requested (queue) date2022-09-14
Proposed in-service date2025-11-01
Operational date2025-11-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata