Ashley-Turkey Hill Line 1482, between the Okawville and North Nashville substations (J1225)

Ashley-Turkey Hill Line 1482, between the Okawville and North Nashville substations is a 160.0 MW solar interconnection project in Washington County, Illinois with a current status of withdrawn. It is proposed to connect at Ashley-Turkey Hill Line 1482, between the Okawville and North Nashville substations.

160.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameAshley-Turkey Hill Line 1482, between the Okawville and North Nashville substations
Queue IDJ1225
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity160.0 MW
StateIllinois
CountyWashington County
Point of interconnectionAshley-Turkey Hill Line 1482, between the Okawville and North Nashville substations
Requested (queue) date2019-04-27
Proposed in-service date2023-09-29
Operational date2023-09-29
Withdrawn date2021-08-05
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata