Aster Substation 138kV Bus (J808)

Aster Substation 138kV Bus is a 99.0 MW solar interconnection project in Randolph County, Illinois with a current status of operational. It is proposed to connect at Aster Substation 138kV Bus.

99.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameAster Substation 138kV Bus
Queue IDJ808
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity99.0 MW
StateIllinois
CountyRandolph County
Point of interconnectionAster Substation 138kV Bus
Requested (queue) date2017-06-16
Proposed in-service date2019-09-01
Operational date2019-09-01
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata