Astoria 345 kV Substation (J493/J510) (J1485)

Astoria 345 kV Substation (J493/J510) is a 250.0 MW wind interconnection project in Deuel County, South Dakota with a current status of operational. It is proposed to connect at Astoria 345 kV Substation (J493/J510).

250.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameAstoria 345 kV Substation (J493/J510)
Queue IDJ1485
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity250.0 MW
StateSouth Dakota
CountyDeuel County
Point of interconnectionAstoria 345 kV Substation (J493/J510)
Requested (queue) date2019-04-29
Proposed in-service date2022-10-30
Operational date2022-10-30
Withdrawn date
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata