Astoria - Brookings County 345.0kV (J4032)
Astoria - Brookings County 345.0kV is a 442.0 MW gas interconnection project in Deuel, South Dakota with a current status of withdrawn. It is proposed to connect at Astoria - Brookings County 345.0kV.
442.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology
Project facts
| Canonical name | Astoria - Brookings County 345.0kV |
|---|---|
| Queue ID | J4032 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Gas |
| Capacity | 442.0 MW |
| State | South Dakota |
| County | Deuel |
| Point of interconnection | Astoria - Brookings County 345.0kV |
| Requested (queue) date | 2025-05-30 |
| Proposed in-service date | 2030-12-01 |
| Operational date | 2030-12-01 |
| Withdrawn date | 2025-12-26 |
| Developer | — |
| Utility / transmission owner | NORTHERN STATES POWER COMPANY |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata