Astoria Energy Storage (0931)

Astoria Energy Storage is a 100.0 MW battery interconnection project in Queens, New York with a current status of active. It is proposed to connect at Astoria West 138kV.

100.0 MWCapacity
ActiveStatus
JMarket
BatteryTechnology

Project facts

Canonical nameAstoria Energy Storage
Queue ID0931
Statusactive
Source status12
MarketJ
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyQueens
Point of interconnectionAstoria West 138kV
Requested (queue) date2019-10-28
Proposed in-service date
Operational date
Withdrawn date
DeveloperEast River ESS, LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata