Astoria Repowering-Phase 2 (0070)

Astoria Repowering-Phase 2 is a 173.0 MW gas interconnection project in Queens, New York with a current status of withdrawn. It is proposed to connect at Astoria 138kV.

173.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameAstoria Repowering-Phase 2
Queue ID0070
Statuswithdrawn
Source status0
Market
TechnologyGas
Capacity173.0 MW
StateNew York
CountyQueens
Point of interconnectionAstoria 138kV
Requested (queue) date2000-08-18
Proposed in-service date2006-08-09
Operational date
Withdrawn date
DeveloperReliant Energy
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata