Atascocita BESS (25INR0713)

Atascocita BESS is a 9.9 MW battery interconnection project with a current status of active. It is proposed to connect at Station Name: ATASCOCITA_x000D_ TSP Station Code: AT_x000D_ Load Transformer Name: LD3_x000D_ Bus #: 40130_x000D_ Voltage in kV (Transmission Level): 138.

9.9 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameAtascocita BESS
Queue ID25INR0713
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity9.9 MW
State
County
Point of interconnectionStation Name: ATASCOCITA_x000D_ TSP Station Code: AT_x000D_ Load Transformer Name: LD3_x000D_ Bus #: 40130_x000D_ Voltage in kV (Transmission Level): 138
Requested (queue) date2024-10-10
Proposed in-service date2027-04-08
Operational date
Withdrawn date
DeveloperSMT Houston IV LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata