Atlanta 69kV I (AE2-319)

Atlanta 69kV I is a 100.0 MW solar interconnection project in Pickaway, Ohio with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameAtlanta 69kV I
Queue IDAE2-319
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity100.0 MW
StateOhio
CountyPickaway
Point of interconnection—
Requested (queue) date2019-03-31
Proposed in-service date2028-10-01
Operational date—
Withdrawn date2024-02-09
Developer—
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.