Au Gres Solar Project (E0007)
Au Gres Solar Project is a 179.5 MW solar interconnection project in Arenac, Michigan with a current status of active. It is proposed to connect at Twining-Whittemore 138kV.
179.5 MWCapacity
ActiveStatus
MISOMarket
SolarTechnology
Project facts
| Canonical name | Au Gres Solar Project |
|---|---|
| Queue ID | E0007 |
| Status | active |
| Source status | active |
| Market | MISO |
| Technology | Solar |
| Capacity | 179.5 MW |
| State | Michigan |
| County | Arenac |
| Point of interconnection | Twining-Whittemore 138kV |
| Requested (queue) date | 2025-08-06 |
| Proposed in-service date | 2028-04-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | DTE Electric |
| Utility / transmission owner | DTE Electric Company |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata