Arenac County, Michigan — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Arenac, Michigan, representing 864 MW of requested capacity.
5Total projects
2Active
0Operational
3Withdrawn
864 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 864 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Gallagher - Tittabawassee 345 kV | J2493 | Solar | 184.0 MW | withdrawn | Arenac, Michigan |
| Au Gres Solar Project | E0007 | Solar | 179.5 MW | active | Arenac, Michigan |
| Whittemore to Twining 138 kV | J2876 | Solar | 175.0 MW | withdrawn | Arenac, Michigan |
| Au Gres Solar Park | 69462_AUGSP | Solar | 175.0 MW | active | Arenac, Michigan |
| Whittemore to Twining 138 kV | J2671 | Solar | 150.0 MW | withdrawn | Arenac, Michigan |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| DTE Electric | 1 | 180 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.