Aulander Hwy 42 Solar, LLC (63332_NCAUL)

Aulander Hwy 42 Solar, LLC is a 5.0 MW solar interconnection project in Hertford, North Carolina with a current status of operational.

5.0 MWCapacity
OperationalStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameAulander Hwy 42 Solar, LLC
Queue ID63332_NCAUL
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologySolar
Capacity5.0 MW
StateNorth Carolina
CountyHertford
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2016-12-01
Withdrawn date
Developer
Utility / transmission ownerCardinal Renewables

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.