Ault-Carey 230 (21-11157)

Ault-Carey 230 is a 125.0 MW battery interconnection project in Fort Collins, Colorado with a current status of active. It is proposed to connect at Ault-Carey 230.

125.0 MWCapacity
ActiveStatus
COMarket
BatteryTechnology

Project facts

Canonical nameAult-Carey 230
Queue ID21-11157
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketCO
TechnologyBattery
Capacity125.0 MW
StateColorado
CountyFort Collins
Point of interconnectionAult-Carey 230
Requested (queue) date2021-11-15
Proposed in-service date2026-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPRPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata