Ault-Carey 230 (23-05032)

Ault-Carey 230 is a 50.0 MW battery interconnection project in Fort Collins, Colorado with a current status of withdrawn. It is proposed to connect at Ault-Carey 230.

50.0 MWCapacity
WithdrawnStatus
COMarket
BatteryTechnology

Project facts

Canonical nameAult-Carey 230
Queue ID23-05032
Statuswithdrawn
Source statusWITHDRAWN
MarketCO
TechnologyBattery
Capacity50.0 MW
StateColorado
CountyFort Collins
Point of interconnectionAult-Carey 230
Requested (queue) date2023-05-03
Proposed in-service date2026-01-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPRPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata