Aurora Renewable Energy (Hybrid) (67983_AURRB)

Aurora Renewable Energy (Hybrid) is a 50.0 MW battery interconnection project in Stanislaus, California with a current status of active.

50.0 MWCapacity
ActiveStatus
BANCMarket
BatteryTechnology

Project facts

Canonical nameAurora Renewable Energy (Hybrid)
Queue ID67983_AURRB
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketBANC
TechnologyBattery
Capacity50.0 MW
StateCalifornia
CountyStanislaus
Point of interconnection—
Requested (queue) date—
Proposed in-service date2028-04-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerVesper Energy Development LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata