Austin Bayou Storage II (25INR0236)

Austin Bayou Storage II is a 156.6 MW other interconnection project in Brazoria, Texas with a current status of operational. It is proposed to connect at Tap to CKT#27 from Savana (Bus# 43180) to Oasis (Bus# 43035) – 345 kV Line.

156.6 MWCapacity
OperationalStatus
BrazoriaMarket
OtherTechnology

Project facts

Canonical nameAustin Bayou Storage II
Queue ID25INR0236
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketBrazoria
TechnologyOther
Capacity156.6 MW
StateTexas
CountyBrazoria
Point of interconnectionTap to CKT#27 from Savana (Bus# 43180) to Oasis (Bus# 43035) – 345 kV Line
Requested (queue) date2023-03-08
Proposed in-service date
Operational date2027-06-01
Withdrawn date
DeveloperAustin Bayou Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata