Austin-Meredosia 345kV line (J757)

Austin-Meredosia 345kV line is a 303.6 MW wind interconnection project in Morgan County,Sangamon County, Illinois with a current status of operational. It is proposed to connect at Austin-Meredosia 345kV line.

303.6 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameAustin-Meredosia 345kV line
Queue IDJ757
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity303.6 MW
StateIllinois
CountyMorgan County,Sangamon County
Point of interconnectionAustin-Meredosia 345kV line
Requested (queue) date2016-11-14
Proposed in-service date2020-08-14
Operational date2020-08-14
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata