Austin TX GigaFactory (65070_A04)

Austin TX GigaFactory is a 2.3 MW solar interconnection project in Travis, Texas with a current status of active.

2.3 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameAustin TX GigaFactory
Queue ID65070_A04
Statusactive
Source status(TS) Construction complete, but not yet in commercial operation
MarketERCO
TechnologySolar
Capacity2.3 MW
StateTexas
CountyTravis
Point of interconnection
Requested (queue) date
Proposed in-service date2026-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTesla Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata