AZ Queue Project 2022-G1 — Solar+Battery in La Paz County, Arizona

AZ Queue Project 2022-G1 — Solar+Battery in La Paz County, Arizona is a 250.0 MW solar+battery interconnection project in La Paz County, Arizona with a current status of active. It is proposed to connect at Bouse Substation 161kV.

250.0 MWCapacity
ActiveStatus
AZMarket
Solar+BatteryTechnology

Project facts

Canonical nameAZ Queue Project 2022-G1 — Solar+Battery in La Paz County, Arizona
Queue ID2022-G1
Statusactive
Source status
MarketAZ
TechnologySolar+Battery
Capacity250.0 MW
StateArizona
CountyLa Paz County
Point of interconnectionBouse Substation 161kV
Requested (queue) date2022-01-28
Proposed in-service date2025-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Desert Southwest Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: wapa-dsw-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata