AZ Queue Project 2022-G10 — Solar+Battery in Pinal County, Arizona

AZ Queue Project 2022-G10 — Solar+Battery in Pinal County, Arizona is a 150.0 MW solar+battery interconnection project in Pinal County, Arizona with a current status of active. It is proposed to connect at ED5 Substation.

150.0 MWCapacity
ActiveStatus
AZMarket
Solar+BatteryTechnology

Project facts

Canonical nameAZ Queue Project 2022-G10 — Solar+Battery in Pinal County, Arizona
Queue ID2022-G10
Statusactive
Source status
MarketAZ
TechnologySolar+Battery
Capacity150.0 MW
StateArizona
CountyPinal County
Point of interconnectionED5 Substation
Requested (queue) date2022-07-08
Proposed in-service date2025-11-20
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Desert Southwest Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: wapa-dsw-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata