AZ Queue Project 2023-G5 — Solar+Battery in Mohave County, Arizona
AZ Queue Project 2023-G5 — Solar+Battery in Mohave County, Arizona is a 225.0 MW solar+battery interconnection project in Mohave County, Arizona with a current status of active. It is proposed to connect at White Hills 345- kV Substation.
225.0 MWCapacity
ActiveStatus
AZMarket
Solar+BatteryTechnology
Project facts
| Canonical name | AZ Queue Project 2023-G5 — Solar+Battery in Mohave County, Arizona |
|---|---|
| Queue ID | 2023-G5 |
| Status | active |
| Source status | — |
| Market | AZ |
| Technology | Solar+Battery |
| Capacity | 225.0 MW |
| State | Arizona |
| County | Mohave County |
| Point of interconnection | White Hills 345- kV Substation |
| Requested (queue) date | 2023-04-24 |
| Proposed in-service date | 2026-12-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Western Area Power Administration - Desert Southwest Region |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: wapa-dsw-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata