AZ Queue Project 2025-G2 — Solar+Battery in Pinal County, Arizona

AZ Queue Project 2025-G2 — Solar+Battery in Pinal County, Arizona is a 100.0 MW solar+battery interconnection project in Pinal County, Arizona with a current status of active. It is proposed to connect at Testtrack 230 kV Substation.

100.0 MWCapacity
ActiveStatus
AZMarket
Solar+BatteryTechnology

Project facts

Canonical nameAZ Queue Project 2025-G2 — Solar+Battery in Pinal County, Arizona
Queue ID2025-G2
Statusactive
Source status
MarketAZ
TechnologySolar+Battery
Capacity100.0 MW
StateArizona
CountyPinal County
Point of interconnectionTesttrack 230 kV Substation
Requested (queue) date2025-10-07
Proposed in-service date2030-01-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Desert Southwest Region

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: wapa-dsw-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.