AZ Queue Project 2025-G3 — Solar+Battery in Pinal County, Arizona

AZ Queue Project 2025-G3 — Solar+Battery in Pinal County, Arizona is a 300.0 MW solar+battery interconnection project in Pinal County, Arizona with a current status of active. It is proposed to connect at Test Track – ED 3 230 kV line.

300.0 MWCapacity
ActiveStatus
AZMarket
Solar+BatteryTechnology

Project facts

Canonical nameAZ Queue Project 2025-G3 — Solar+Battery in Pinal County, Arizona
Queue ID2025-G3
Statusactive
Source status
MarketAZ
TechnologySolar+Battery
Capacity300.0 MW
StateArizona
CountyPinal County
Point of interconnectionTest Track – ED 3 230 kV line
Requested (queue) date2025-10-14
Proposed in-service date2029-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Desert Southwest Region

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: wapa-dsw-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata