Azure Sky Wind Project, LLC Hybrid (64164_ASWBE)

Azure Sky Wind Project, LLC Hybrid is a 120.0 MW battery interconnection project in Throckmorton, Texas with a current status of operational.

120.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameAzure Sky Wind Project, LLC Hybrid
Queue ID64164_ASWBE
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity120.0 MW
StateTexas
CountyThrockmorton
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2023-12-01
Withdrawn date—
Developer—
Utility / transmission ownerAzure Sky Wind Project, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.