Babcock Solar Energy Center Hybrid (59993_BA)

Babcock Solar Energy Center Hybrid is a 10.0 MW battery interconnection project in Charlotte, Florida with a current status of operational.

10.0 MWCapacity
OperationalStatus
FPLMarket
BatteryTechnology

Project facts

Canonical nameBabcock Solar Energy Center Hybrid
Queue ID59993_BA
Statusoperational
Source status(OP) Operating
MarketFPL
TechnologyBattery
Capacity10.0 MW
StateFlorida
CountyCharlotte
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2018-03-01
Withdrawn date
Developer
Utility / transmission ownerFlorida Power & Light

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.