Babcock Solar Energy Center Hybrid (59993_BA)

Babcock Solar Energy Center Hybrid is a 10.0 MW battery interconnection project in Charlotte, Florida with a current status of operational.

10.0 MWCapacity
OperationalStatus
FPLMarket
BatteryTechnology

Project facts

Canonical nameBabcock Solar Energy Center Hybrid
Queue ID59993_BA
Statusoperational
Source status(OP) Operating
MarketFPL
TechnologyBattery
Capacity10.0 MW
StateFlorida
CountyCharlotte
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2018-03-01
Withdrawn date—
Developer—
Utility / transmission ownerFlorida Power & Light

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.