Badger to Woodward 345kV line (approximately fifty (50) miles west of Woodward District EHV 345kV Substation) (GEN-2016-001)
Badger to Woodward 345kV line (approximately fifty (50) miles west of Woodward District EHV 345kV Substation) is a 300.3 MW wind interconnection project in Beaver, Oklahoma with a current status of withdrawn. It is proposed to connect at Badger to Woodward 345kV line (approximately fifty (50) miles west of Woodward District EHV 345kV Substation).
Project facts
| Canonical name | Badger to Woodward 345kV line (approximately fifty (50) miles west of Woodward District EHV 345kV Substation) |
|---|---|
| Queue ID | GEN-2016-001 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OK |
| Technology | Wind |
| Capacity | 300.3 MW |
| State | Oklahoma |
| County | Beaver |
| Point of interconnection | Badger to Woodward 345kV line (approximately fifty (50) miles west of Woodward District EHV 345kV Substation) |
| Requested (queue) date | 2016-02-11 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2017-02-26 |
| Developer | — |
| Utility / transmission owner | OGE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata