Beaver County, Oklahoma — Interconnection Projects
The interXdata warehouse tracks 9 interconnection projects in Beaver, Oklahoma, representing 1,673 MW of requested capacity.
9Total projects
0Active
5Operational
4Withdrawn
1,673 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 9 | 1,673 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Badger to Woodward 345kV line (approximately fifty (50) miles west of Woodward District EHV 345kV Substation) | GEN-2016-001 | Wind | 300.3 MW | withdrawn | Beaver, Oklahoma |
| Balko Wind LLC | 58900_BAL1 | Wind | 299.7 MW | operational | Beaver, Oklahoma |
| Tap Hitchland - Woodward Dbl Ckt (GEN-2011-014 Tap) 345kV | GEN-2014-052 | Wind | 200.0 MW | withdrawn | Beaver, Oklahoma |
| Beaver County - Woodward EHV Dbl Ckt (Badger) 345kV | GEN-2015-082 | Wind | 200.0 MW | operational | Beaver, Oklahoma |
| Ponderosa Wind Energy Center | 63590_PONDE | Wind | 200.0 MW | operational | Beaver, Oklahoma |
| Bluestem | 60256_1 | Wind | 198.0 MW | operational | Beaver, Oklahoma |
| GEN-2006-016 | GEN-2006-016 | Wind | 100.0 MW | withdrawn | Beaver, Oklahoma |
| Ponderosa Wind II | 66155_GP01 | Wind | 100.0 MW | operational | Beaver, Oklahoma |
| Beaver County 345 kV Substation | GEN-2022-148 | Wind | 75.0 MW | withdrawn | Beaver, Oklahoma |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Beaver County.