Baker 138 kV (AD1-125)

Baker 138 kV is a 80.0 MW wind interconnection project in Hardy, West Virginia with a current status of active.

80.0 MWCapacity
ActiveStatus
Market
WindTechnology

Project facts

Canonical nameBaker 138 kV
Queue IDAD1-125
Statusactive
Source statusEngineering and Procurement
Market
TechnologyWind
Capacity80.0 MW
StateWest Virginia
CountyHardy
Point of interconnection
Requested (queue) date2017-09-28
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata