Baker Branch BESS (27INR0409)

Baker Branch BESS is a 287.2 MW other interconnection project in Lamar, Texas with a current status of operational. It is proposed to connect at Pacific Switch (PACSW) 345 kV Bus 11683.

287.2 MWCapacity
OperationalStatus
LamarMarket
OtherTechnology

Project facts

Canonical nameBaker Branch BESS
Queue ID27INR0409
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketLamar
TechnologyOther
Capacity287.2 MW
StateTexas
CountyLamar
Point of interconnectionPacific Switch (PACSW) 345 kV Bus 11683
Requested (queue) date2025-06-19
Proposed in-service date
Operational date2029-12-31
Withdrawn date
DeveloperMockingbird Storage Center, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata