Baldwin Plant 345kV Switchyard - Baldwin Unit 2 (J1202)

Baldwin Plant 345kV Switchyard - Baldwin Unit 2 is a 68.4 MW solar interconnection project in Randolph County, Illinois with a current status of operational. It is proposed to connect at Baldwin Plant 345kV Switchyard - Baldwin Unit 2.

68.4 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameBaldwin Plant 345kV Switchyard - Baldwin Unit 2
Queue IDJ1202
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity68.4 MW
StateIllinois
CountyRandolph County
Point of interconnectionBaldwin Plant 345kV Switchyard - Baldwin Unit 2
Requested (queue) date2019-04-25
Proposed in-service date2021-06-15
Operational date2021-06-15
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata