Baldy Mesa 2_Silver Peak Hybrid is a 50.0 MW solar interconnection project in San Bernardino, California with a current status of operational.

50.0 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameBaldy Mesa 2_Silver Peak Hybrid
Queue ID66885_SPKPV
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity50.0 MW
StateCalifornia
CountySan Bernardino
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-12-01
Withdrawn date
Developer
Utility / transmission ownerAES Clean Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.