Balenger Sewage-Thomas Bakery 34.5kV (Y2-096)

Balenger Sewage-Thomas Bakery 34.5kV is a 47.2 MW other interconnection project in Frederick, Maryland with a current status of withdrawn.

47.2 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameBalenger Sewage-Thomas Bakery 34.5kV
Queue IDY2-096
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity47.2 MW
StateMaryland
CountyFrederick
Point of interconnection
Requested (queue) date2012-10-31
Proposed in-service date2016-08-18
Operational date
Withdrawn date2014-12-02
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata