Barbara BESS (28INR0437)
Barbara BESS is a 200.5 MW other interconnection project in Nueces, Texas with a current status of operational. It is proposed to connect at LINE TAP OF WESTSIDE (8485) AND WEIL TRACT (8482) 138 KV TRANSMISSION LINE.
200.5 MWCapacity
OperationalStatus
NuecesMarket
OtherTechnology
Project facts
| Canonical name | Barbara BESS |
|---|---|
| Queue ID | 28INR0437 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Nueces |
| Technology | Other |
| Capacity | 200.5 MW |
| State | Texas |
| County | Nueces |
| Point of interconnection | LINE TAP OF WESTSIDE (8485) AND WEIL TRACT (8482) 138 KV TRANSMISSION LINE |
| Requested (queue) date | 2025-09-22 |
| Proposed in-service date | — |
| Operational date | 2028-05-02 |
| Withdrawn date | — |
| Developer | Barbara BESS LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata