Barberton–Seiberling 23kV (X2-085)

Barberton–Seiberling 23kV is a 14.0 MW solar interconnection project in Summit, Ohio with a current status of withdrawn.

14.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameBarberton–Seiberling 23kV
Queue IDX2-085
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity14.0 MW
StateOhio
CountySummit
Point of interconnection—
Requested (queue) date2011-07-29
Proposed in-service date2014-06-30
Operational date—
Withdrawn date2014-06-12
Developer—
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.