Barrelhead (AG1-471)

Barrelhead is a 54.0 MW solar interconnection project with a current status of active. It is proposed to connect at Up Church-Wayne County 69 kV.

54.0 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameBarrelhead
Queue IDAG1-471
Statusactive
Source statusactive
MarketPJM
TechnologySolar
Capacity54.0 MW
StateKentucky
County
Point of interconnectionUp Church-Wayne County 69 kV
Requested (queue) date2020-09-30
Proposed in-service date2029-01-15
Operational date
Withdrawn date
DeveloperBarrelhead Solar, LLC
Utility / transmission ownerEKPC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata