Barrett Hempstead Battery Storage is a 40.0 MW battery interconnection project in Nassau, New York with a current status of withdrawn. It is proposed to connect at Barrett to Long Beach 33 kV circuit No 1(33-224).

40.0 MWCapacity
WithdrawnStatus
KMarket
BatteryTechnology

Project facts

Canonical nameBarrett Hempstead Battery Storage
Queue ID1254
Statuswithdrawn
Source status0
MarketK
TechnologyBattery
Capacity40.0 MW
StateNew York
CountyNassau
Point of interconnectionBarrett to Long Beach 33 kV circuit No 1(33-224)
Requested (queue) date2021-09-22
Proposed in-service date2025-12-31
Operational date
Withdrawn date
DeveloperBarrett Hempstead Battery Storage
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata