Barron 161 kV (J1808)

Barron 161 kV is a 200.0 MW solar interconnection project in Barron, Wisconsin with a current status of operational. It is proposed to connect at Barron 161 kV.

200.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameBarron 161 kV
Queue IDJ1808
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity200.0 MW
StateWisconsin
CountyBarron
Point of interconnectionBarron 161 kV
Requested (queue) date2020-06-25
Proposed in-service date2023-02-28
Operational date2023-02-28
Withdrawn date
Developer
Utility / transmission ownerDAIRYLAND POWER COOPERATIVE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.