Barron 161 kV (J1808)
Barron 161 kV is a 200.0 MW solar interconnection project in Barron, Wisconsin with a current status of operational. It is proposed to connect at Barron 161 kV.
200.0 MWCapacity
OperationalStatus
—Market
SolarTechnology
Project facts
| Canonical name | Barron 161 kV |
|---|---|
| Queue ID | J1808 |
| Status | operational |
| Source status | Done |
| Market | — |
| Technology | Solar |
| Capacity | 200.0 MW |
| State | Wisconsin |
| County | Barron |
| Point of interconnection | Barron 161 kV |
| Requested (queue) date | 2020-06-25 |
| Proposed in-service date | 2023-02-28 |
| Operational date | 2023-02-28 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | DAIRYLAND POWER COOPERATIVE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata