DAIRYLAND POWER COOPERATIVE — Interconnection Queue Projects
DAIRYLAND POWER COOPERATIVE is associated with 23 tracked interconnection projects representing 3,254 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 15 | 1,965 MW |
| Battery | 4 | 539 MW |
| Wind | 3 | 400 MW |
| Other | 1 | 350 MW |
Geographic footprint
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| MISO Queue Project J4229 — Generation in an unlisted county, the U.S. | J4229 | — | 350.0 MW | operational | — |
| Wabaco | J3848 | Battery | 250.0 MW | operational | Wabasha, Minnesota |
| Wabaco to Alma 161 kV Tap | J2600 | Solar | 245.0 MW | withdrawn | Wabasha, Minnesota |
| Briggs Road - North Madison 345.0kV | J1502 | Solar | 225.0 MW | operational | Juneau, Wisconsin |
| Postville | J3314 | Solar | 200.0 MW | withdrawn | Clayton, Iowa |
| Barron 161 kV | J1808 | Solar | 200.0 MW | operational | Barron, Wisconsin |
| NELSON DEWEY (ATC) - GRAN GRAE (ATC) 161.0kV | J3448 | Wind | 180.0 MW | operational | Grant, Wisconsin |
| ROCHESTER - WABACO 161.0kV | J2219 | Solar | 180.0 MW | operational | Olmsted, Minnesota |
| Alma | J2102 | Battery | 150.0 MW | withdrawn | Buffalo, Wisconsin |
| Rochester 161kV (A) to Adams 161kV (B) | J2861 | Solar | 147.0 MW | operational | Mower, Minnesota |
| Other_ | J2863 | Solar | 125.0 MW | withdrawn | Fillmore, Minnesota |
| Beaver Creek to Rice 161 kV line tap (same POI as J898) | J1769 | Wind | 120.0 MW | operational | Howard, Iowa |
| BARRON - WASHCO 161.0kV | J3433 | Solar | 115.0 MW | withdrawn | Barron, Wisconsin |
| BARRON - WASHCO 161.0kV | J3523 | Battery | 115.0 MW | operational | Barron, Wisconsin |
| ALMA - ROCK ELM 161.0kV | J4130 | Solar | 110.0 MW | operational | Pepin, Wisconsin |
| Apple River 161 kV Substation | J1314 | Solar | 100.0 MW | operational | Polk County, Wisconsin |
| Rice - Beaver Creek 161kV line tap | J898 | Wind | 100.0 MW | operational | Howard County, Iowa |
| Independence - Bridge Creek 69.0kV | J2227 | Solar | 89.0 MW | operational | Trempealeau, Wisconsin |
| Barron | J3198 | Solar | 80.0 MW | operational | Barron, Wisconsin |
| Crystal Cave-Rock Elm 161kV line tap | J801 | Solar | 74.0 MW | withdrawn | Pierce County, Wisconsin |
| Cherry Grove 69kV Substation | J718 | Solar | 50.0 MW | operational | Fillmore County, Minnesota |
| Whistling Wings 69 kV Substation | J1397 | Solar | 25.0 MW | withdrawn | Juneau County, Wisconsin |
| Whistiling Wings 69 kV Substation | J1429 | Battery | 24.0 MW | withdrawn | Juneau County, Wisconsin |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through DAIRYLAND POWER COOPERATIVE.
Start tracking with interXdata