DAIRYLAND POWER COOPERATIVE is associated with 23 tracked interconnection projects representing 3,254 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

23Projects
0Active
15Operational
8Withdrawn
3,254 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar151,965 MW
Battery4539 MW
Wind3400 MW
Other1350 MW

Geographic footprint

StateProjects
Wisconsin13
Minnesota6
Iowa3

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
MISO Queue Project J4229 — Generation in an unlisted county, the U.S.J4229350.0 MWoperational
WabacoJ3848Battery250.0 MWoperationalWabasha, Minnesota
Wabaco to Alma 161 kV TapJ2600Solar245.0 MWwithdrawnWabasha, Minnesota
Briggs Road - North Madison 345.0kVJ1502Solar225.0 MWoperationalJuneau, Wisconsin
PostvilleJ3314Solar200.0 MWwithdrawnClayton, Iowa
Barron 161 kVJ1808Solar200.0 MWoperationalBarron, Wisconsin
NELSON DEWEY (ATC) - GRAN GRAE (ATC) 161.0kVJ3448Wind180.0 MWoperationalGrant, Wisconsin
ROCHESTER - WABACO 161.0kVJ2219Solar180.0 MWoperationalOlmsted, Minnesota
AlmaJ2102Battery150.0 MWwithdrawnBuffalo, Wisconsin
Rochester 161kV (A) to Adams 161kV (B)J2861Solar147.0 MWoperationalMower, Minnesota
Other_J2863Solar125.0 MWwithdrawnFillmore, Minnesota
Beaver Creek to Rice 161 kV line tap (same POI as J898)J1769Wind120.0 MWoperationalHoward, Iowa
BARRON - WASHCO 161.0kVJ3433Solar115.0 MWwithdrawnBarron, Wisconsin
BARRON - WASHCO 161.0kVJ3523Battery115.0 MWoperationalBarron, Wisconsin
ALMA - ROCK ELM 161.0kVJ4130Solar110.0 MWoperationalPepin, Wisconsin
Apple River 161 kV SubstationJ1314Solar100.0 MWoperationalPolk County, Wisconsin
Rice - Beaver Creek 161kV line tapJ898Wind100.0 MWoperationalHoward County, Iowa
Independence - Bridge Creek 69.0kVJ2227Solar89.0 MWoperationalTrempealeau, Wisconsin
BarronJ3198Solar80.0 MWoperationalBarron, Wisconsin
Crystal Cave-Rock Elm 161kV line tapJ801Solar74.0 MWwithdrawnPierce County, Wisconsin
Cherry Grove 69kV SubstationJ718Solar50.0 MWoperationalFillmore County, Minnesota
Whistling Wings 69 kV SubstationJ1397Solar25.0 MWwithdrawnJuneau County, Wisconsin
Whistiling Wings 69 kV SubstationJ1429Battery24.0 MWwithdrawnJuneau County, Wisconsin

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through DAIRYLAND POWER COOPERATIVE.

Start tracking with interXdata