BARRON - WASHCO 161.0kV (J3523)

BARRON - WASHCO 161.0kV is a 115.0 MW battery interconnection project in Barron, Wisconsin with a current status of operational. It is proposed to connect at BARRON - WASHCO 161.0kV.

115.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameBARRON - WASHCO 161.0kV
Queue IDJ3523
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity115.0 MW
StateWisconsin
CountyBarron
Point of interconnectionBARRON - WASHCO 161.0kV
Requested (queue) date2024-04-16
Proposed in-service date2028-09-30
Operational date2028-09-30
Withdrawn date
Developer
Utility / transmission ownerDAIRYLAND POWER COOPERATIVE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata