Basalt 230 kV Load (L0629)
Basalt 230 kV Load is a 154.0 MW other interconnection project in Umatilla, Oregon with a current status of active. It is proposed to connect at McNary Substation via McNary-Wanapa Switching Station No 1 230 kV line.
154.0 MWCapacity
ActiveStatus
ORMarket
OtherTechnology
Project facts
| Canonical name | Basalt 230 kV Load |
|---|---|
| Queue ID | L0629 |
| Status | active |
| Source status | STUDY |
| Market | OR |
| Technology | Other |
| Capacity | 154.0 MW |
| State | Oregon |
| County | Umatilla |
| Point of interconnection | McNary Substation via McNary-Wanapa Switching Station No 1 230 kV line |
| Requested (queue) date | 2024-10-01 |
| Proposed in-service date | 2027-01-02 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Umatilla Electric Cooperative |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata