Basalt Solar (20INR0013)
Basalt Solar is a 20.0 MW solar interconnection project in Uvalde, Texas with a current status of suspended.
20.0 MWCapacity
SuspendedStatus
UvaldeMarket
SolarTechnology
Project facts
| Canonical name | Basalt Solar |
|---|---|
| Queue ID | 20INR0013 |
| Status | suspended |
| Source status | — |
| Market | Uvalde |
| Technology | Solar |
| Capacity | 20.0 MW |
| State | Texas |
| County | Uvalde |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | suspended | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata