BasRanch (TEF - Due Diligence) (25INR0008)

BasRanch (TEF - Due Diligence) is a 1,350.0 MW gas interconnection project in Ward, Texas with a current status of operational. It is proposed to connect at tap 345kV Riverton Switch - Sand Lake Switch.

1,350.0 MWCapacity
OperationalStatus
WardMarket
GasTechnology

Project facts

Canonical nameBasRanch (TEF - Due Diligence)
Queue ID25INR0008
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketWard
TechnologyGas
Capacity1,350.0 MW
StateTexas
CountyWard
Point of interconnectiontap 345kV Riverton Switch - Sand Lake Switch
Requested (queue) date2020-08-04
Proposed in-service date
Operational date2028-12-01
Withdrawn date
DeveloperCPV Valley, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata