Bastrop Peaking Generators (TEF-Due Diligence) (26INR0261)
Bastrop Peaking Generators (TEF-Due Diligence) is a 1,104.0 MW gas interconnection project in Bastrop, Texas with a current status of operational. It is proposed to connect at 7048 L_GARFIE5_1Y 345kV.
1,104.0 MWCapacity
OperationalStatus
BastropMarket
GasTechnology
Project facts
| Canonical name | Bastrop Peaking Generators (TEF-Due Diligence) |
|---|---|
| Queue ID | 26INR0261 |
| Status | operational |
| Source status | SS Completed, FIS Started, IA |
| Market | Bastrop |
| Technology | Gas |
| Capacity | 1,104.0 MW |
| State | Texas |
| County | Bastrop |
| Point of interconnection | 7048 L_GARFIE5_1Y 345kV |
| Requested (queue) date | 2024-02-02 |
| Proposed in-service date | — |
| Operational date | 2027-12-07 |
| Withdrawn date | — |
| Developer | MPH Bastrop Peakers, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.