Bastrop Peaking Generators (TEF-Due Diligence) (26INR0261)

Bastrop Peaking Generators (TEF-Due Diligence) is a 1,104.0 MW gas interconnection project in Bastrop, Texas with a current status of operational. It is proposed to connect at 7048 L_GARFIE5_1Y 345kV.

1,104.0 MWCapacity
OperationalStatus
BastropMarket
GasTechnology

Project facts

Canonical nameBastrop Peaking Generators (TEF-Due Diligence)
Queue ID26INR0261
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketBastrop
TechnologyGas
Capacity1,104.0 MW
StateTexas
CountyBastrop
Point of interconnection7048 L_GARFIE5_1Y 345kV
Requested (queue) date2024-02-02
Proposed in-service date
Operational date2027-12-07
Withdrawn date
DeveloperMPH Bastrop Peakers, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata