Battery Storage addition(QP1192) is a 101.1 MW solar+battery interconnection project in Hartford, Connecticut with a current status of withdrawn. It is proposed to connect at To interconnect at the POI of Broadleaf Storage, via a shared facility. It is connected as a tap at existing 345 kV line between N. Bloomfield to Agawam Line. POI is approximately 3.6 mi north of N. Bloomfield and 11.5 mi south of Agawam..

101.1 MWCapacity
WithdrawnStatus
CTMarket
Solar+BatteryTechnology

Project facts

Canonical nameBattery Storage addition(QP1192)
Queue ID1496
Statuswithdrawn
Source statusW
MarketCT
TechnologySolar+Battery
Capacity101.1 MW
StateConnecticut
CountyHartford
Point of interconnectionTo interconnect at the POI of Broadleaf Storage, via a shared facility. It is connected as a tap at existing 345 kV line between N. Bloomfield to Agawam Line. POI is approximately 3.6 mi north of N. Bloomfield and 11.5 mi south of Agawam.
Requested (queue) date2024-02-07
Proposed in-service date2027-12-15
Operational date
Withdrawn date2025-10-11
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata