Battery Storage addition(QP1192) (1496)
Battery Storage addition(QP1192) is a 101.1 MW solar+battery interconnection project in Hartford, Connecticut with a current status of withdrawn. It is proposed to connect at To interconnect at the POI of Broadleaf Storage, via a shared facility. It is connected as a tap at existing 345 kV line between N. Bloomfield to Agawam Line. POI is approximately 3.6 mi north of N. Bloomfield and 11.5 mi south of Agawam..
Project facts
| Canonical name | Battery Storage addition(QP1192) |
|---|---|
| Queue ID | 1496 |
| Status | withdrawn |
| Source status | W |
| Market | CT |
| Technology | Solar+Battery |
| Capacity | 101.1 MW |
| State | Connecticut |
| County | Hartford |
| Point of interconnection | To interconnect at the POI of Broadleaf Storage, via a shared facility. It is connected as a tap at existing 345 kV line between N. Bloomfield to Agawam Line. POI is approximately 3.6 mi north of N. Bloomfield and 11.5 mi south of Agawam. |
| Requested (queue) date | 2024-02-07 |
| Proposed in-service date | 2027-12-15 |
| Operational date | — |
| Withdrawn date | 2025-10-11 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.