Battery Storage CNR Only (1231)
Battery Storage CNR Only is a 204.6 MW battery interconnection project in Windham, Connecticut with a current status of withdrawn. It is proposed to connect at Eversource Killingly 345kV Substation.
204.6 MWCapacity
WithdrawnStatus
CTMarket
BatteryTechnology
Project facts
| Canonical name | Battery Storage CNR Only |
|---|---|
| Queue ID | 1231 |
| Status | withdrawn |
| Source status | W |
| Market | CT |
| Technology | Battery |
| Capacity | 204.6 MW |
| State | Connecticut |
| County | Windham |
| Point of interconnection | Eversource Killingly 345kV Substation |
| Requested (queue) date | 2022-03-04 |
| Proposed in-service date | 2025-05-01 |
| Operational date | — |
| Withdrawn date | 2022-04-22 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata