Battery Storage CNR Only (1231)

Battery Storage CNR Only is a 204.6 MW battery interconnection project in Windham, Connecticut with a current status of withdrawn. It is proposed to connect at Eversource Killingly 345kV Substation.

204.6 MWCapacity
WithdrawnStatus
CTMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage CNR Only
Queue ID1231
Statuswithdrawn
Source statusW
MarketCT
TechnologyBattery
Capacity204.6 MW
StateConnecticut
CountyWindham
Point of interconnectionEversource Killingly 345kV Substation
Requested (queue) date2022-03-04
Proposed in-service date2025-05-01
Operational date
Withdrawn date2022-04-22
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata