Battery Storage CNR Only (1258)

Battery Storage CNR Only is a 170.0 MW battery interconnection project in Norfolk, Massachusetts with a current status of withdrawn. It is proposed to connect at National Grid's South Wrentham 115kV Substation.

170.0 MWCapacity
WithdrawnStatus
SEMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage CNR Only
Queue ID1258
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyBattery
Capacity170.0 MW
StateMassachusetts
CountyNorfolk
Point of interconnectionNational Grid's South Wrentham 115kV Substation
Requested (queue) date2022-05-03
Proposed in-service date2027-07-26
Operational date
Withdrawn date2025-10-11
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata