Battery Storage CNR Only (see QP887) (1253)

Battery Storage CNR Only (see QP887) is a 150.0 MW battery interconnection project in Norfolk, Massachusetts with a current status of withdrawn. It is proposed to connect at Wareham Substation 115kV, Eversource Line 113.

150.0 MWCapacity
WithdrawnStatus
SEMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage CNR Only (see QP887)
Queue ID1253
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyBattery
Capacity150.0 MW
StateMassachusetts
CountyNorfolk
Point of interconnectionWareham Substation 115kV, Eversource Line 113
Requested (queue) date2022-04-27
Proposed in-service date2026-05-31
Operational date
Withdrawn date2023-11-14
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata